New construction of an elevator in Rudenkivka village
69 Myru Str., the village of Rudenkivka, Novi Sanzhary District, Poltava Region
700
Types of work:
  • Site survey
  • Topographical survey
  • Detailed design documents
  • Designer supervision
Project readiness:
100%
Design year:
2019
Direction of work
Technical and economic indicators
Type of construction new construction
Facility capacity 133,200 thous. tons
Site area according to the land use map 6,2873 ha
Description of the project

The Company carried out engineering surveys at the site and developed design specifications and estimates. This project provides for the construction of an elevator in the village of Rudenkivka, Novi Sanzhary District, Poltava Region. The construction is carried out in three stages.

Project solutions

The list of major buildings and structures designed as part of the complex:

  • Receiving section
  • Waste silo
  • Working tower
  • Silo for loading grain onto road transport
  • Section for loading grain onto railroad cars
  • Wet grain silo
  • Cooling silo
  • Long-term storage silos
  • Load racks
  • Grain dryers
  • Control room
  • Administrative building with a laboratory
  • Fire tanks
  • On-site mains
  • Water supply
  • Domestic sewage
  • Rain sewage
  • Automation
  • Reliability and safety sections