The reconstruction pre-design proposes technical and process solutions for the construction of a facility located within the territory of the existing enterprise Skorokhodivsky Elevator.
To increase the capacity of the existing facility for the primary processing and storage of grains and oilseeds, the following improvements are planned:
The reconstruction also includes the integration of additional grain
flows into the existing process flow to enhance the flexibility and productivity of the facility.
The following sections have been developed in the project:
Explanatory Note (EN), Master Plan (MP), Production Technology (PT), Cost Estimate Documentation (CED).
The construction will take place in one stage.
Design and estimate documentation has been developed for the following objects of buildings and structures, namely: